Dilapidations and Strip Out at the End of a Commercial Lease

Short answer

At the end of a commercial lease, the tenant usually has to remove alterations, reinstate the premises and carry out repairs and redecoration under the lease. Doing the strip out and reinstatement before the lease ends, to an agreed scope, often costs less than paying the landlord's dilapidations claim afterwards. Agree the scope in writing, keep records and leave enough time.

Dilapidations and Strip Out at the End of a Commercial Lease

What dilapidations means

Dilapidations are the breaches of a lease's repair, reinstatement, redecoration and yielding up obligations at the end of the term. If the tenant does not leave the premises in the condition the lease requires, the landlord can claim damages. The claim usually starts with a schedule of dilapidations listing each item and the cost of putting it right.

For many tenants, reinstatement is the largest single part of that claim. Partitions, kitchens, cabling, signage and other alterations added during the lease often have to be removed, and the premises returned to the original layout. That is where a planned strip out comes in.

ObligationTypical sourceStrip out role
Remove alterationsLicence for alterations, reinstatement clauseCentral
Reinstate original layoutReinstatement clauseCentral
RepairRepairing covenantSeparate but often done alongside
RedecorateDecoration covenantUsually follows the strip out
Yield up clean and clearYielding up clauseWaste removal and final clean

Why doing the work yourself can save money

If you leave the premises unstripped, the landlord's claim will be based on their own costs, which may include professional fees, a contingency and a period of lost rent while the work is carried out. Doing the work before you leave, with your own contractor, lets you control the scope, the price and the timing.

There are limits to what a landlord can claim. Under section 18(1) of the Landlord and Tenant Act 1927, damages for breach of a repairing covenant cannot exceed the reduction in the value of the landlord's interest caused by the disrepair. If the landlord plans to demolish or substantially alter the premises, some items may have no value to them. Specialist advice is worth taking on larger claims.

There is also a pre-action protocol for dilapidations claims in England and Wales, which sets out how claims should be presented and responded to.

Timing is everything

Start planning at least six to twelve months before the lease ends on larger premises. That gives time to read the lease and licences, take advice, agree the scope with the landlord, get quotes, and complete the work before the end date. Strip outs that run past the end of the lease can cause further claims, including for occupation.

On smaller units, three to six months is often enough, but do not leave it to the last month. Contractors book up, and asbestos surveys, service isolations and landlord approvals all take time.

  • Read the lease, licences and any schedule of condition
  • Take advice from a building surveyor on larger claims
  • Request the landlord's interim schedule if offered
  • Agree the reinstatement scope in writing
  • Get fixed-price strip out quotes
  • Complete the work before the lease end date
  • Hold a joint inspection and record the handover

Agreeing the scope with the landlord

Before you start, ask the landlord or their surveyor what they want removed and what they are happy to keep. Some landlords want a full reinstatement to the original layout. Others prefer to keep a good kitchen, meeting rooms or partitions for the next tenant. Anything they choose to keep is money you do not spend.

Get the agreed scope in writing, ideally as a marked-up plan or a short schedule. It protects both sides and gives the contractor a clear brief. If the landlord will not engage, follow the lease strictly and keep a full record of what you did.

Keeping evidence

Photograph every area before, during and after the strip out. Keep the contractor's scope, invoices, waste transfer notes, consignment notes for hazardous waste such as fluorescent tubes, and any certificates for service isolation or refrigerant recovery. These records show what was done, when and to what standard.

At handover, walk the premises with the landlord or their surveyor and note any items they raise. Dealing with a few small points on the spot is far cheaper than defending them later in a claim.

What the strip out typically covers

A dilapidations-led strip out usually removes partitions and meeting rooms, kitchens and tea points, data cabling and containment, signage, specialist lighting and tenant air conditioning, and makes good the surfaces behind. It may include reinstating ceiling tiles and floor finishes to match the base build.

Office strip outs to Cat A typically cost £4–£9 per sq ft, and small shops £2,500–£8,000. We arrange the work through vetted, insured contractors and provide the waste paperwork you need for your records.

Mistakes that increase claims

The most expensive mistake is leaving it too late. A tenant who realises a month before the lease ends that they must strip three floors will struggle to find a contractor, may have to work out of hours at higher rates, and risks overrunning into a period they have no right to occupy.

Other common mistakes include stripping more than the lease requires, such as removing a landlord's ceiling that should have stayed; leaving services uncapped or unlabelled; failing to make good holes and fixings; and not keeping records. Each can turn into a line on the schedule of dilapidations. A clear scope, a reputable contractor and good evidence avoid nearly all of them.

Questions people also ask

Is it cheaper to do the strip out or pay the dilapidations claim?

Often it is cheaper to do the work yourself before the lease ends, because you control the scope and price, and avoid the landlord's fees, contingencies and any claim for loss of rent while work is done. Each case differs, so take advice on larger claims.

When should I start planning an end-of-lease strip out?

For larger premises, six to twelve months before the lease ends. For small units, three to six months is usually enough. That allows time to agree the scope with the landlord, get quotes, deal with asbestos surveys and service isolations, and finish before the end date.

Can the landlord ask me to remove alterations they previously approved?

Often yes. Licences for alterations commonly require the tenant to remove the alterations and reinstate the premises at the end of the lease, unless the landlord waives that. Check the wording of each licence and agree in writing anything the landlord is happy to keep.