Commercial Strip Out glossary
The terms you'll come across, explained in plain English.
- Cat A
- The landlord's base build for offices: suspended ceilings, raised floors, lighting, air conditioning and finished walls, without tenant partitions or fittings.
- Cat B
- The tenant's fit-out added to a Cat A space, including partitions, meeting rooms, kitchens, furniture, data cabling and branding.
- Commercial strip out
- Removal of internal fixtures, fittings and non-structural elements from business premises, returning them to Cat A, shell or an agreed condition.
- Construction phase plan
- The document required under CDM 2015 setting out how health and safety risks will be managed during construction work, including strip outs.
- Dilapidations
- Breaches of a lease's repair, reinstatement, redecoration and yielding up obligations at the end of the term, which can lead to a claim by the landlord.
- F-gas certification
- The qualification required for technicians who recover refrigerant from air conditioning and refrigeration equipment under the fluorinated gas rules.
- Licence for alterations
- The landlord's formal consent for a tenant to alter the premises, often requiring removal and reinstatement at the end of the lease.
- Making good
- Repairing surfaces and finishes after removal work, such as filling holes, sealing penetrations and capping services, to leave a tidy, safe condition.
- R&D asbestos survey
- A refurbishment and demolition survey identifying asbestos in areas to be disturbed, required before strip out under the Control of Asbestos Regulations 2012.
- Raised access floor
- A floor of removable panels on adjustable pedestals, creating a void for cabling and services beneath. Common in offices.
- Reinstatement
- Returning premises to their original layout or condition by removing tenant alterations, usually required at the end of a lease.
- Schedule of dilapidations
- A document prepared for the landlord listing each alleged breach of lease covenants and the work or cost needed to remedy it.
- Shell and core
- A bare building with structure, capped services and finished common parts, but no ceilings, raised floors or internal fit-out in the lettable space.
- Soft strip
- Removal of all non-structural materials, such as fittings, finishes and services, before refurbishment or demolition, leaving the structure exposed.
- Suspended ceiling
- A ceiling of tiles held in a metal grid hung below the structural soffit, leaving a void for services and lighting.
- WEEE
- Waste electrical and electronic equipment, such as IT kit, lighting and appliances, which must go to suitable treatment under the WEEE Regulations 2013.
Get a free commercial strip out quote
Tell us what you need and we'll come back with a clear price.
Request a quote