Removal of all non-structural materials before refurbishment or demolition, separating waste streams so the main works start on a clean shell.

What's involved
A soft strip removes everything that is not part of the building's structure, so the main contractor can start on bare walls, floors and soffits. That includes plasterboard linings, ceilings, floor finishes, joinery, sanitaryware, doors, windows if specified, and mechanical and electrical services. Waste is segregated into timber, metal, plasterboard, inert and general waste, which lifts recycling rates and lowers disposal costs. Plasterboard is kept dry and separate, as it should not go to landfill mixed with biodegradable waste. Before soft strip starts, a refurbishment and demolition asbestos survey must be done for the areas involved. The team follows a method statement, keeps fire escape routes open and works with the principal contractor under the construction phase plan.
How we handle it
Share the brief
Use the quote form to describe the premises, floor area, what needs removing, your deadline and any lease or dilapidations schedule you are working to.
Survey and fixed price
A contractor visits to measure, check access, review the asbestos survey and services, then sends a fixed price and an outline programme.
Planning and isolation
Method statements and risk assessments are prepared, building management agrees access and services are isolated safely by qualified engineers.
Strip out works
The team removes items in a planned sequence, segregating waste for recycling and protecting shared areas, lifts and neighbouring tenants.
Handover
The space is swept and left to the agreed standard. You receive photos and waste transfer notes for your landlord, client or records.
Price guide
Commercial strip outs are usually priced per square foot or as a fixed project price after a survey. The main drivers are floor area, how much is being removed, access, working hours and the amount of waste that cannot be recycled. Night or weekend work in occupied buildings costs more. The figures below are 2026 guide rates.
- Restaurant or kitchen strip out: £4,000–£15,000. Includes equipment, canopy, extraction and bar removal, with gas and refrigerant isolation arranged.
- Pallet racking removal: from £8 per bay. Dismantling and removal, often offset by the scrap or resale value of the steel.
- Mezzanine floor removal: £25–£60 per m². Depends on size, height, deck type and access for lifting equipment.
Questions about soft strip before refurbishment or demolition
What is a commercial strip out?
A commercial strip out is the removal of internal fixtures, fittings and non-structural elements from business premises. It typically includes partitions, ceilings, raised floors, flooring, kitchens, signage and redundant services. The aim is to return the space to shell, Cat A or a condition agreed in the lease before refurbishment, re-letting or handback.
How long does a commercial strip out take?
A small shop or office usually takes two to five working days. A 10,000 square foot office or restaurant can take one to two weeks, and large industrial units with racking and mezzanines can take longer. Out-of-hours working, goods lift access and asbestos findings are the main things that change timescales.
How much does a commercial strip out cost?
Commercial strip outs typically cost £4–£9 per square foot for offices returned to Cat A and £6–£14 per square foot for a full back to shell strip. Small shops often cost £2,500–£8,000. Access, working hours and waste volumes have the biggest effect on the final price.
Other services
Office Strip Out
Partitions, suspended ceilings, raised floors, carpet tiles, kitchens and data cabling removed from offices of any size, back to Cat A or shell.
Retail and Shop Strip Out
Shopfronts, signage, shelving, counters, flooring and stockroom racking removed so units can be handed back or refitted quickly.
Restaurant and Commercial Kitchen Strip Out
Catering equipment, canopies, extraction, cold rooms, bars and seating removed from restaurants, pubs and cafes, with gas and refrigerant handled properly.
Industrial and Warehouse Unit Strip Out
Mezzanine floors, pallet racking, office pods, machinery bases and redundant services cleared from warehouses and industrial units.
Dilapidations and Lease-End Reinstatement
Strip out and make-good works that return premises to the condition set out in the lease, helping tenants reduce dilapidations claims.