Commercial Strip Out

Commercial Strip Out

Industrial and Warehouse Unit Strip Out

Mezzanine floors, pallet racking, office pods, machinery bases and redundant services cleared from warehouses and industrial units.

Free Commercial Strip Out quote

No obligation. We only use your details to reply about this job.

Industrial and Warehouse Unit Strip Out — Commercial Strip Out

What's involved

Industrial units tend to have big, heavy items: pallet racking, mezzanine floors, office pods built inside the shell, conveyor systems, machinery and the services feeding them. Racking is unloaded, unbolted and lowered in a controlled sequence using MEWPs and forklifts. Mezzanines are dismantled panel by panel with temporary edge protection. Machinery bases and anchor bolts are cut flush, and redundant compressed air, power and water runs are stripped back to safe isolation points. Floor markings can be removed with grinding or shot blasting if your lease requires it. Most steel goes for recycling, often reducing the overall cost. A 20,000 square foot unit with racking and a mezzanine usually takes one to two weeks, depending on the amount of plant.

How we handle it

  1. Share the brief

    Use the quote form to describe the premises, floor area, what needs removing, your deadline and any lease or dilapidations schedule you are working to.

  2. Survey and fixed price

    A contractor visits to measure, check access, review the asbestos survey and services, then sends a fixed price and an outline programme.

  3. Planning and isolation

    Method statements and risk assessments are prepared, building management agrees access and services are isolated safely by qualified engineers.

  4. Strip out works

    The team removes items in a planned sequence, segregating waste for recycling and protecting shared areas, lifts and neighbouring tenants.

  5. Handover

    The space is swept and left to the agreed standard. You receive photos and waste transfer notes for your landlord, client or records.

Price guide

Commercial strip outs are usually priced per square foot or as a fixed project price after a survey. The main drivers are floor area, how much is being removed, access, working hours and the amount of waste that cannot be recycled. Night or weekend work in occupied buildings costs more. The figures below are 2026 guide rates.

  • Office strip out to Cat A: £4–£9 per sq ft. Removal of tenant partitions, kitchens, cabling and finishes while keeping the landlord's base build.
  • Mezzanine floor removal: £25–£60 per m². Depends on size, height, deck type and access for lifting equipment.
  • Pallet racking removal: from £8 per bay. Dismantling and removal, often offset by the scrap or resale value of the steel.

Questions about industrial and warehouse unit strip out

What is a commercial strip out?

A commercial strip out is the removal of internal fixtures, fittings and non-structural elements from business premises. It typically includes partitions, ceilings, raised floors, flooring, kitchens, signage and redundant services. The aim is to return the space to shell, Cat A or a condition agreed in the lease before refurbishment, re-letting or handback.

How long does a commercial strip out take?

A small shop or office usually takes two to five working days. A 10,000 square foot office or restaurant can take one to two weeks, and large industrial units with racking and mezzanines can take longer. Out-of-hours working, goods lift access and asbestos findings are the main things that change timescales.

How much does a commercial strip out cost?

Commercial strip outs typically cost £4–£9 per square foot for offices returned to Cat A and £6–£14 per square foot for a full back to shell strip. Small shops often cost £2,500–£8,000. Access, working hours and waste volumes have the biggest effect on the final price.

Get a free commercial strip out quote

Tell us what you need and we'll come back with a clear price.

Request a quote