East Sussex · South East
Commercial Strip Out in Newhaven
Retail and hospitality brands across East Sussex, including Newhaven, rely on us for fast strip outs between tenants.
Newhaven and the surrounding area
We cover all of Newhaven and the wider East Sussex area. Jobs here are mostly in the BN9 postcode areas. Nearby places we also cover include Telscombe Cliffs and East Saltdean.
Working in Newhaven
Industrial estates outside Newhaven usually allow daytime working, which keeps costs lower than city centres. Farm diversification units around Newhaven often contain mezzanines and office pods that come out during a strip out.
Clay soils across much of the South East move with the seasons, which affects anything built into the ground, from walls and bases to drainage. Victorian commercial buildings in Newhaven often hide original features behind suspended ceilings, which may need protecting during strip out.
Our services in Newhaven
Restaurant and Commercial Kitchen Strip Out
Catering equipment, canopies, extraction, cold rooms, bars and seating removed from restaurants, pubs and cafes, with gas and refrigerant handled properly.
Industrial and Warehouse Unit Strip Out
Mezzanine floors, pallet racking, office pods, machinery bases and redundant services cleared from warehouses and industrial units.
Soft Strip Before Refurbishment or Demolition
Removal of all non-structural materials before refurbishment or demolition, separating waste streams so the main works start on a clean shell.
Dilapidations and Lease-End Reinstatement
Strip out and make-good works that return premises to the condition set out in the lease, helping tenants reduce dilapidations claims.
Office Strip Out
Partitions, suspended ceilings, raised floors, carpet tiles, kitchens and data cabling removed from offices of any size, back to Cat A or shell.
Retail and Shop Strip Out
Shopfronts, signage, shelving, counters, flooring and stockroom racking removed so units can be handed back or refitted quickly.
Guide prices for Newhaven
- Mezzanine floor removal: £25–£60 per m². Depends on size, height, deck type and access for lifting equipment.
- Pallet racking removal: from £8 per bay. Dismantling and removal, often offset by the scrap or resale value of the steel.
- Restaurant or kitchen strip out: £4,000–£15,000. Includes equipment, canopy, extraction and bar removal, with gas and refrigerant isolation arranged.
Prices are a guide. Your quote for Newhaven is a fixed price based on the details you give us. Full price guide.
Commercial Strip Out questions from Newhaven
How quickly can a strip out start in Newhaven?
Small strip outs in Newhaven can often start within one to two weeks of agreeing the price, once access and isolations are arranged. Larger projects may need longer for planning. If you have a tight deadline, mention it on the quote form.
Do I need a permit for a skip in Newhaven?
If a skip or container needs to sit on the road in Newhaven, you will usually need a permit from East Sussex. Many contractors use wait-and-load vehicles in town centres to avoid permits. The contractor will advise on the best approach.
Is an asbestos survey needed for strip outs in Newhaven?
Yes, a refurbishment and demolition asbestos survey is required before strip out work disturbs building fabric. Many older buildings in Newhaven contain asbestos, so the survey must be checked and any findings dealt with before work starts.
Do you strip out restaurants in Newhaven?
Yes. Restaurant and kitchen strip outs in Newhaven include equipment, canopies, extraction, bars and seating. Gas is isolated by a Gas Safe engineer and refrigerant is recovered by an F-gas certified technician before units are removed.
Can fixtures and furniture be reused?
Yes, office furniture, shelving, racking, kitchen equipment and some partitions can often be reused, resold or donated. Salvage reduces waste and can offset costs. Tell the contractor early which items have value so they are removed carefully rather than broken up for disposal.
How long does a commercial strip out take?
A small shop or office usually takes two to five working days. A 10,000 square foot office or restaurant can take one to two weeks, and large industrial units with racking and mezzanines can take longer. Out-of-hours working, goods lift access and asbestos findings are the main things that change timescales.
Helpful guides
Commercial Strip Out Regulations UK: CDM, Asbestos and Waste
Commercial strip outs in the UK must comply with the Construction (Design and Management) Regulations 2015, which require planning and…
Read the guide →Cat A vs Cat B vs Shell: Office Fit-Out Grades Explained
Shell and core is the bare structure with capped services and common parts finished. Cat A adds the landlord's base build: suspended…
Read the guide →Get a free commercial strip out quote in Newhaven
Tell us what you need and we'll come back with a clear price.
Request a quote